electric current required two poles,in this case current travel by overhead line and than rich train engines through pantograph. than it is ground by it's wheels.
so current is complete its path.
that means another pole is GROUND.
the rails
the other pole is on the track on which the train runs.
The Rails beneath the train
The rails, (which are grounded).
The potential is between the ground and the power wire. The earth is used as the 'return` conductor in this set-up.
Every electric network need close circuit to complete current path. In traction one pole is overhead and another one is thru rail track. Voltage supplied to tarction engine is achived thru overhead as well rail track to complete circuit.
the tracks.
More Questions and Answers:
I need to get a list now... please help.....?
I am using R-11 as a heat trasnfer fluid at low temperature. Any suitable alternative for the same purpose?
Is it ok if the compressor in the refrigerator is working continiously irrespective of thermostat setting?
Factors limiting mass of projectiles in guns?
What is O S & Y Gate valve and how is it different from a normal Gate valve?
Something is wrong with the electrical wiring in my apartment now.?
18V to 18V 1A DC to DC CONVENTER?
Is there a "rule of thumb" factor of safety that would account for dynamics of human locomotion?
In domestic electrical power supply can I use a fuse rated 5 Amps/230 VAC insted of 5 Amps/110 VAC ??
Answer:
electric current required two poles,in this case current travel by overhead line and than rich train engines through pantograph. than it is ground by it's wheels.
so current is complete its path.
that means another pole is GROUND.
the rails
the other pole is on the track on which the train runs.
The Rails beneath the train
The rails, (which are grounded).
The potential is between the ground and the power wire. The earth is used as the 'return` conductor in this set-up.
Every electric network need close circuit to complete current path. In traction one pole is overhead and another one is thru rail track. Voltage supplied to tarction engine is achived thru overhead as well rail track to complete circuit.
the tracks.
The answers post by the user, for information only, FunQA.com does not guarantee the right.
More Questions and Answers: